Bio mass CHP plant, Kupiansk, Kharkiv region. Feasibility study
Bio mass CHP plant, Kupiansk, Kharkiv region. Feasibility study
Site Location: Kovsharivka, Kupiansk, Kharkiv Region, Ukraine
Client: Department of Housing and Communal Services of Kharkiv Region State Administration
Design Stage: Feasibility Study
Summary of key solutions
The CHP plant is designed for use of straw and wood chips as fuel. The main building of the CHPP is designed as a two-bay variable-storey building, where the main and auxiliary equipment is located.
The CHPP main building consists of three sections:
- The Turbine Hall – the 18.0 m bay, the roofing beam elevation is 19 000 m;
- The Deaerator Hall – the 6.0 m bay;
- The Boiler Bunker Hall – the 34.0 m bay, the roofing beam elevation is 26,700 m along the axis B.
The CHPP Layout is "two boilers - the common steam header - the turbine". The location of the turbine generator set in the hall is longitudinal.
The Siemens turbine SST-111 is installed in the hall with an alternating current generator with the auxiliary equipment.
The design provides for installation of two boilers Е-20-6.5-490DR to be produced by "Kotloturboprom" LLC.
The Project Technical and Economic Data
- Annual Electric Power Generation, thousand kWh/year - 69,945.20
- Annual Heat Power Generation, thousand Gcal/year - 64.44
- Electric Power Consumption for CHPP Auxiliary Needs:
- in percentage - 23.0
- thousand kW/year - 16087.4 - Annual Electric Power Output, thousand kWh/year - 53,857.8
- Annual Heat Power Output, thousand Gcal/year - 62.51
- Annual Natural Fuel Consumption, tons/year:
- Wood Chips - 29 033.4
- Straw - 67 744.6 - Annual Water Consumption for the Process Cycle Makeup, thousand m3/year - 24.90
- Annual Water Consumption for the Circulating Water Supply System Makeup, thousand m3/year - 0.0
- Annual Ash Output, t/year - 1 848.4
- The Cost of Water for the Process Cycle and the Circulating Water Supply System Makeup, thousand EURO/year - 11.95
- Investments Payback Time Period, years - 5.8
- Specific Capital Investments in Construction, EURO/kW (without VAT) - 1.996
- Construction Time Period, years - 2.0
- Area of the industrial site fenced, hectare - 3.0
- Building Density, % - 37.0