Bio mass CHP plant, Kupiansk, Kharkiv region. Feasibility study

Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства

Bio mass CHP plant, Kupiansk, Kharkiv region. Feasibility study

9,6 MW

Site Location: Kovsharivka, Kupiansk, Kharkiv Region, Ukraine

Client: Department of Housing and Communal Services of Kharkiv Region State Administration

Design Stage: Feasibility Study

Summary of key solutions

The CHP plant is designed for use of straw and wood chips as fuel. The main building of the CHPP is designed as a two-bay variable-storey building, where the main and auxiliary equipment is located.
The CHPP main building consists of three sections:

  • The Turbine Hall – the 18.0 m bay, the roofing beam elevation is 19 000 m;
  • The Deaerator Hall – the 6.0 m bay;
  • The Boiler Bunker Hall – the 34.0 m bay, the roofing beam elevation is 26,700 m along the axis B.

The CHPP Layout is "two boilers - the common steam header - the turbine". The location of the turbine generator set in the hall is longitudinal.
The Siemens turbine SST-111 is installed in the hall with an alternating current generator with the auxiliary equipment.
The design provides for installation of two boilers Е-20-6.5-490DR to be produced by "Kotloturboprom" LLC.

 

The Project Technical and Economic Data

  • Annual Electric Power Generation, thousand kWh/year - 69,945.20
  • Annual Heat Power Generation, thousand Gcal/year - 64.44
  • Electric Power Consumption for CHPP Auxiliary Needs:    
    - in percentage - 23.0
    - thousand kW/year - 16087.4
  • Annual Electric Power Output, thousand kWh/year - 53,857.8
  • Annual Heat Power Output, thousand Gcal/year - 62.51
  • Annual Natural Fuel Consumption, tons/year:    
    - Wood Chips - 29 033.4
    - Straw - 67 744.6
  • Annual Water Consumption for the Process Cycle Makeup, thousand m3/year - 24.90
  • Annual Water Consumption for the Circulating Water Supply System Makeup, thousand m3/year - 0.0
  • Annual Ash Output, t/year - 1 848.4
  • The Cost of Water for the Process Cycle and the Circulating Water Supply System Makeup, thousand EURO/year - 11.95
  • Investments Payback Time Period, years - 5.8
  • Specific Capital Investments in Construction, EURO/kW (without VAT) - 1.996
  • Construction Time Period, years - 2.0
  • Area of the industrial site fenced, hectare - 3.0
  • Building Density, % - 37.0