Construction of a biomass power plant in Pereyaslav-Khmelnitsky, Kyiv region
Construction of a biomass power plant in Pereyaslav-Khmelnitsky, Kyiv region
The plant location: Pereyaslav-Khmelnitsky, Kyiv Region, Ukraine
The Customer: «EPG «Pivdenenerhopromtrans» LLC
Design Stages:
- Feasibility Study
- Conceptual Design Documentation
- Detailed Design Documentation
Technical-Economic Indices of the Project
- Number of hours of the installed capacity use, h/year is 8 482
- Annual electric power generation, thousands kWh/year - 42410.0
- Annual electric power output, thousands kWh/year - 36095
- Total staff, persons - 33
- The main funds costs, thousand hrv. - 267496.659
- The main fuel is wooden
- Fuel burning heat, Kcal /kg - 2000
- The equivalent fuel specific consumption for the electric power output, g.e.f. /kW*h, - 619.8
- Electric power self-cost, hrv./kW*h (as of 2017) - 2.38.
- Inner norm of profitability, % - 30.0.
- Capital investments recoupment time period, years - 5.6.
- Site area, ha is 2.67. Land-to-building ratio, % - 31.2.
Brief Description of Main Solutions
The object main purpose is the electric power generation in the generator, actuated by the condensing steam turbine, with the use of the steam supplied from the steam boiler where the wooden chips are fired. The main and standby fuel is the wooden chips.
The main production area includes the main building with the power output system and the fuel acceptance unit.
The auxiliary production area includes cooling towers, packaged transformer substation (2nd turn), auxiliary building with administrative – personal service rooms, fire-fighting system, turbine oil emergency discharge tanks, treatment plants and wooden chipping complex (2nd turn).
The storage production area includes the wooden chips store, truck pass-through, weigh station, being within the scope of the 2nd construction turn.
The steam boiler is single-drum, with vertical-water tubes, of natural circulation, with rotating fire grating.
The steam boiler main technical data:
- Maximum heat power, MW - 20.8
- Maximum steam efficiency, kg/s (t/h) - 6.39 (23.004)
Steam operation data:
- Temperature, °С - 485
- Gage pressure, МPа - 6.25
Steam rated data:
- Temperature, °С - 505
- Gage pressure, МPа - 7.3
- Efficiency coefficient, % - 85
The condensing single-cylinder steam turbine of Triveni Company is intended for electric power generation.
The condensing steam turbine main technical data:
Electric power in the condensing mode, MW - 5.0.
Steam parameters at the turbine inlet:
- Gage pressure, MPa - 6.1
- Temperature, ° С - 480
- Rated steam flow rate, kg/s (t/h) - 6.04 (21.744)
- Rated absolute steam pressure at the turbine outlet, МPа - 0.007
- Turbine rounds per minute, rpm - 8278
- Generator rounds per minute, rpm - 1500
- Turbine generator weight (approximate), kg - 22000.