Reconstruction of the 150 kV Main Step-Down SS-1 with Four Transformers to Be Installed. The 150/6/6 kV Main Step-Down SS-1 of JSC «Poltavsky GZK».
Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства
Reconstruction of the 150 kV Main Step-Down SS-1 with Four Transformers to Be Installed. The 150/6/6 kV Main Step-Down SS-1 of JSC «Poltavsky GZK».
2017
150
kV
The object location: Poltava region, Ukraine.
The Customer: JSC «Poltavsky GZK» (Ore-Dressing Enterprise) (Komsomolsk town).
Designing Stages:
- Detailed design documentation.
The Project Technical-Economic Indices
- 40 МVА 150/10 kV transformers, pcs - 2.
- ASS МО 110 kV, pcs - 2.
Brief Description of Main Solutions
Provided for is the SS 150 kV switchyard reconstruction based on the «bridge» scheme with two 40 МVА 150/10 kV transformers each installation, the modules PASS МО 110 kV installation and the 6 kV busbar bridge replacement.
The construction start is scheduled in 2017.