Reconstruction of the 150 kV Main Step-Down SS-1 with Four Transformers to Be Installed. The 150/6/6 kV Main Step-Down SS-1 of JSC «Poltavsky GZK».

Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства

Reconstruction of the 150 kV Main Step-Down SS-1 with Four Transformers to Be Installed. The 150/6/6 kV Main Step-Down SS-1 of JSC «Poltavsky GZK».

2017
150 kV

The object location: Poltava region, Ukraine.
The Customer: JSC «Poltavsky GZK» (Ore-Dressing Enterprise) (Komsomolsk town).
Designing Stages:

  • Detailed design documentation.

polavskgok1polavskgok2

                                                  

 

 

 

 

 

 

 

 

The Project Technical-Economic Indices

  • 40 МVА 150/10 kV transformers, pcs - 2.
  • ASS МО 110 kV, pcs - 2.

Brief Description of Main Solutions

 

Provided for is the SS 150 kV switchyard reconstruction based on the «bridge» scheme with two 40 МVА 150/10 kV transformers each installation, the modules PASS МО 110 kV installation and the 6 kV busbar bridge replacement.

The construction start is scheduled in 2017.