Restoration of Monitoring & Control System with Simultaneous Implementation of PACS at the Power Generation Units Nos. 1-4 of the 1st turn of Reconstruction at Uglegorsk TPP Restoration
Restoration of Monitoring & Control System with Simultaneous Implementation of PACS at the Power Generation Units Nos. 1-4 of the 1st turn of Reconstruction at Uglegorsk TPP Restoration
The object location: Svetlodarsk town, Donetsk region, Ukraine.
The Customer: Uglegorsk TPP PJSC «Tsentrenergo».
Designing Stages:
- Conceptual design documentation.
- Detailed design documentation, including site supervisionр.
The Project Technical-Economic Indices
- Annual energy resource demand, t.e.f.- 150.
- Software-Hardware complex - TREI-5B-05.
Brief Description of Main Solutions
The refurbishment of the monitoring & control system is provided for based on the up-to-date micro-processor based devices. As the software-hardware complex of the control & monitoring system there has been used TREI-5B-05 of the TREI GMBH Company (Germany).
Based on the results of the project review there have been obtained the Positive Opinions of SE «Ukrgosstroyekspertiza» branch in Donezk region, Account No.05-2065-13 dated 15.07.2013, Account No. 05-1890-15 dated 24.12.2015, Account No. 05-3942-13 dated 04.11.2013, Account No. 05-2064-13 dated 15.08.2013 for the power generation Units Nos. 1, 2, 3, 4 respectively.