«Polyarnaya» TPP in Salekhard Town

Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства

«Polyarnaya» TPP in Salekhard Town

2012
291,6 MW

The object location: Salekhard town, Yamalo-Nenets Autonomous Area, Russian Federation.

The Customer: Power Industry Company «Urals Industrial – Urals Polar».

Designing Stages: Main Technical Solutions, Conceptual Design Documentation, Detailed Design Documentation.
 

 

polyarnaya1polyarnaya2

                                                  

 

 

 

 

 

 

 

 

                                                

The Project Technical-Economic Indices

Installed Capacity:

- Electric (at ambient air temperature minus 7 ºС), MW - 291.6;

- Heat (at ambient air temperature minus 42 ºС), MW (Gcal/h) - 57.8 (49.7).

The main equipment components:

  • GTU V93.2 pcs- 2
  • Waste steam boiler К1, pcs - 2
  • PTU (Steam Turbine Plant) SST-800 pc - 1
  • GTU (Gas Turbine Plant) SGT-600 pc - 1
  • Water heating waste heat recovery boiler SteamGen8, pcs - 2.

Fuel type:

- Main - Natural gas,

- Emergency - Diesel fuel.

Annual electric power output:

- Electric power, mln. kW∙h - 2299.0

- Heat power (in heating system water), thousand Gcal - 171.36.

Annual auxiliary power consumption:

- Electric power, mln. kW∙h (%) - 45.98 (2 %)

- Heat power (in heating system water), thousand Gcal (%) - 45.99(26.84 %).

Annual power supply:

- Electric power, mln. kW∙h – 2253.02

- Heat power (heating system water), thousand Gcal – 125.37.

Number of hours of the installed capacity use:

- Electric power, hour/year- 7884

- Heat power, hour/year - 3448.

Annual fuel consumption:

- Natural fuel (natural gas), mln. nm3- 598.876

- Equivalent fuel, thousand t.e.f.- 677.76.

Equivalent fuel specific flow rates per the electric power supplied:

- Electric power, g. e.f./ kW∙h - 282.5

- Heat power, kg. e.f./ Gcal – 328.6.

Total staff (including production and maintenance and repair staff), persons - 272.

Duration of the construction, months is 28.

Land area, ha - 11.0164.

Land-to-building ratio, % - 54.9.

Brief Description of Main Solutions

   «Polyarnaya» TPP is intended for creation of electric power source with the aim to meet the ever-growing demand of AA Yamalo-Nenets in electric power (power rating), as well as in electric power (power rating) realization at the wholesale market, reliability enhancement of the electric power supply of the region and the heat power supply to Salekhard city.

The designing has been carried out in two stages in conformity with the start-up complexes:

The 1st start-up complex based on:

  • one gas turbine of SGT-600 type with water heating waste heat recovery boiler SteamGen8 ТМ and bypass gas duct, enabling the waste heat recovery boiler to be disconnected in case of no heat loads;
  • two gas turbines V93.2 in the simple cycle with further possibility of extension up to PGU (Steam & Gas Plant).

The 2nd start-up complex:

  • extension of two gas turbines V93.2 by means of installation of two steam waste-heat recovery boilers and the condensing steam turbine SST-800 with no steam extractions.


The construction started in 2012, at present it is blocked.