Feasibility Study of Power Generation Unit, station No. 4 Reconstruction at Zuivska TPP

Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства

Feasibility Study of Power Generation Unit, station No. 4 Reconstruction at Zuivska TPP

315 MW


The object location: Zugres town, Donetsk region, Ukraine.

The Customer: Zuivska TPP of «Skhidenerho» LLC.

Designing Stages:

  •  Feasibility Study.

zutes1

zutes2

 

 

 

 

 

 

 

 

Technical-Economic Indices

  • Power generation Unit capacity, MW - 315.
  • Electric power generation, mln kWh/year - 1890.
  • Construction time period, months - 7.

Brief Description of Main Solutions

Within the reconstruction scope there have been implemented the measures aimed at modernization of the boiler, the turbine, the generator, the heat diagram, the electric filters, the electric equipment, the monitoring & control system of the power generation Unit and the measures aimed at reduction of harmful emissions of the flue gases of the power generation Unit.

These measures have enabled:

  • To increase the installed electric capacity of the power generation Unit
  • To decrease the fuel specific flow rates
  • To prolong the service life of the equipment of the power generation Unit
  • To reduce the gross specific emissions of contaminants into atmosphere.

Based on the results of the project review there has been obtained the Positive Opinion of SE «Ukrderzhbudekspertyza», Kyiv, Account No.00-0739-12/ПБ dated 02.08.2012.