Refurbishment of the Fire Protection Complex at the Uglegorsk TPP Objects

Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства

Refurbishment of the Fire Protection Complex at the Uglegorsk TPP Objects

The object location: Svetlodarsk town, Donetsk region, Ukraine.

The Customer: Uglegorsk TPP PJSC «Tsentrenergo».

Designing Stages:

  • Conceptual design documentation.

uglegorsk1uglegorsk2

                                                  

 

 

 

 

 

 

 

 

The Project Technical-Economic Indices

The Project provides for 5 Stages of construction:

  • The time period of the 1st stage, months - 12.
  • The time period of the 2nd stage, months - 1.
  • The time period of the 3rd stage, months - 6.
  • The time period of the 4th stage, months - 12.
  • The time period of the 4th stage, months - 12.

                                                 

                                                    Brief Description of Main Solutions

   The Project subdivision into 5 Stages of construction is substantiated by the fire-safety measures for buildings, structures and premises which are to be implemented at Uglegorsk TPP.

The project provides for the replacement of the automatic fire alarm system equipment, provision of fire protection of the main load-carrying metal structures, installation of fire-resistant seals with the cables routs crossing the walls and ceilings and in the places of their branching, restoration of the cables fire-protection screening by the fire-protection materials, the hydrogen emergency dumping in the main building turbine hall of the 2nd stage of construction and in the turbine hall of the 1st stage of construction for the power generation Units Nos. 1, 3, 4.
  

   Based on the results of the project review there has been obtained the Positive Opinion of SE «Ukrgosstroyekspertiza» in Donetsk region, Kramatorsk town, Account No.05-0763-15 (05-0838-14) dated 04.01.2016.