Fire-Safety Measures for the Turbine Hall of Main Building and Objects at Trypilska TTP

Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства

Fire-Safety Measures for the Turbine Hall of Main Building and Objects at Trypilska TTP

2015

The object location: Ukrainka town, Kiev region, Ukraine.

The Customer: Trypіlska TTP PJSC «Tsentrenergo».

Designing Stages:

  • Conceptual design documentation.
  • Detailed design documentation.

tripolsk1

tripolsk2

                                                  

 

 

 

 

 

 

 

 

The Project Technical-Economic Indices

Within the refurbishment project provided for are 5 stages of construction for the power generation Units Nos. 1, 3, 4, 5, 6 respectively:

  • 1 Stage
    Construction time period, months- 5
    Quantity of the manual air-foam shafts, pcs- 30
    Quantity of the drencher plants, set- 46.
  • 2 Stage
    Construction time period, months- 4
    Quantity of the manual air-foam shafts, pcs- 30
    Quantity of the drencher plants, set- 35.
  • 3 Stage
    Construction time period, months- 4
    Quantity of the manual air-foam shafts, pcs- 30
    Quantity of the drencher plants, set- 35.
  • 4 Stage
    Construction time period, months- 4
    Quantity of the manual air-foam shafts, pcs- 30
    Quantity of the drencher plants, set- 32.
  • 5 Stage
    Construction time period, months- 4
    Quantity of the manual air-foam shafts, pcs- 30
    Quantity of the drencher plants, set- 34.

Brief Description of Main Solutions

   The project provides for the following fire-safety measures:

  • Installation of automatic fire-fighting systems of the turbine generators and turbines by means of the manual air-foam shafts, the oil filled equipment, the cable drum compartments, the transformers in the station units and by means of the drencher plants;
  • Installation of the gas fire-fighting system of MCR -1,2,3 by means of the self-sustained modular gas fire-fighting system;
  • Installation of the manual air-foam shafts and the drencher plants for cooling the turbine hall roofing metal girders.

Based on the results of the project review there has been obtained the Positive Opinion of SE «Ukrgosstroyekspertiza», Kiev, Account No. 00-1456-14/ІЗ dated 10.04.2015.