grosssGold Deposit «Gross». Ore-Dressing & Processing Enterprise «Gross». Coal-fired 16 MW TETs (Heat & Power Plant)

Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства

grosssGold Deposit «Gross». Ore-Dressing & Processing Enterprise «Gross». Coal-fired 16 MW TETs (Heat & Power Plant)

2016
16 MW

The object location: Sakha Republic, South Jakutia, Russian Federation.

The Customer: «Neryungri -Metallic» LLC.

Designing Stages: Conceptual Design Documentation, Detailed Design Documentation.
 

 

gross1

                                                  

                                                

 

 

 

 

 

 

 

The Project Technical-Economic Indices

  • The installed electric power, MW - 8.0·2=16.0.
  • The installed heat power, Gcal/h – 7.84·2=75.68.
  • The main equipment:
    – The steam turbine generator, quantity х type - 2 х ТГ 8.0/6.3-Р3.4/0.25;
    – The power generation boiler, quantity х type - 5 х КЕ-25-40-440С.
  • Number of hours of the installed electric power use, h - 8180.
  • Number of hours of the installed heat power use, h, - 7314.
  • Quantity of operation hours, h - 8760.
  • Annual electric power generation, kW·h - 130874880.0.
  • Auxiliary needs electric power consumption, kW·h (%) – 20680326.5 (15.8%).
  • Annual output:
    - Electric power, kW·h - 110 194 553.5;
    - Heat power, Gcal/h - 541 299.4.
  • The main fuel type – the coal of СС grade, 0-300 class of Apsatsk coalfield.
  • Combustion heat value, Ccal/kg - 5915. Annual equivalent fuel consumption, t.e.f - 109899.3.
  • Annual natural fuel consumption, t.n.f. - 130058.4.
  • Equivalent fuel specific consumption:
    - For electric power output, g.e.f./ /kW·h - 219.4;
    - For heat power output, kg/Gcal – 158.4.
  • Electric power output cost:
    - Electric power, rub./ kWh-  1.4;
    - Heat power, rub./ Gcal - 1007.
  • Staff – 127 persons.

Brief Description of Main Solutions

The TETs (Heat & Power Plant) is intended for heat and electric power generation for process needs and heat supply to the gold deposit and ore-dressing & processing enterprise «Gross».

As the TETs main equipment are to be installed the five steam boiler units КЕ-25-40-440С of JSC «BiKZ» (Bisk town) manufacture and two back-pressure steam turbine generators ТГ8.0/6.3-Р3.4/0.25 of JSC «Kaluga Turbine Works» manufacture.

The heat power is to be used for:

  • Process needs of the gold deposit and ore-dressing & processing enterprise «Gross», and in the 1st turn – for the leaching solutions heating;
  • Heating and ventilation systems of the enterprise;
  • Hot water supply system of the enterprise;
  • Heating and ventilation systems, hot water supply system for the «Gross» shift-workers village.


This design documentation has obtained Positive Opinion of Federal Autonomy Management (FAU) of the Main State Expertise of Russia «Glavgosekspertiza of Russia».

The construction was started in 2016.