GTU-TETs (Gas-Turbine Plant – Heat & Power Plant) «Mayak-Energiya» LLC, Penza City
GTU-TETs (Gas-Turbine Plant – Heat & Power Plant) «Mayak-Energiya» LLC, Penza City
The object location: Penza city, Russian Federation
The Customer: «Mayak-Energiya» LLC
Designing Stages: Detailed Design Documentation.
The Project Technical-Economic Indices
- The installed electric power (in conformity with СТО 459 70238424.27.100.007-2008), MW - 23.8.
- The installed heat power, Gcal/h - 35.9.
- Area of the Main Building with Electric Engineering Premises, m2 - 1908.
- The total structural volume of the Main Building with Electric Engineering Premises, m3 - 26552.
- GTU type - three SGT-300.
- Annual heat power output, thousand Gcal - 250.8.
- Annual electric power output, mln kW*h - 141.
- The equivalent fuel specific consumption for the heat power output, kg/ Gcal - 150.
- The fuel specific consumption for the electric power output, g/kW*h - 234.83.
- Heat use factor - 0.769.
- Electric power generation efficiency - 0.707.
- Total staff, persons - 60.
- The Construction time period, months - 18.
Brief Description of Main Solutions
On the vacant territory of JSC «Mayak» is provided for the new construction of three power generation Units based on the gas-turbine plants with the waste-heat boilers. The construction of the three power generation Units is provided for based on the up-to-today high-efficient equipment, to be produced by the companies of Russia and other countries.
The components of the main equipment per each power generation Unit are the following:
- The gas turbine plant of the SGT-300 type of «Siemens Industrial Turbomachinery AB» production, of 7.494 MW rated capacity (in conformity with ГОСТ 20440-75);
- The waste-heat boiler Е-20-0.8-170 of JSC «EМАliance» production, of dry saturated steam output 20.79 t/h (at the working pressure of 0.8 МPа(abs.) and the working temperature of 170.4 0С).
The power generation Units operation mode:
- In terms of electric power production (for electric power supply to own production) – basic in conformity with the operation mode of the own paper production.
- In terms of heat power production (steam to the own production) – basic in conformity with the operation mode of the own paper production.
- Loads control range of 25 – 100 %.
Heat power supply to outdoor networks is not provided for.
The power generation Units construction started in 2015 and was scheduled to be completed in 2016.