Astrakhan GTU-TETs (Gas-Turbine Plant of Heat & Power Plant) of Astrakhan Gas Processing Works Auxiliary Needs

Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства

Astrakhan GTU-TETs (Gas-Turbine Plant of Heat & Power Plant) of Astrakhan Gas Processing Works Auxiliary Needs

150 MW

The object location: Krasnyi Yar district, Astrakhan region, RF

The Customer: «Astrakhan TPP» LLC, Moscow, RF

Designing Stages:

  • Conceptual design documentation.

astrahl

                                                  

 

 

 

 

 

 

 

The Progect Technikal-Economic Indices

  • The installed electric capacity, MW - 150.
  • Heat capacity, Gcal/h - 160.
  • Annual electric power supply to consumers, kWh - 1204.5*106.
  • Annual heat power supply to consumers in the form of production steam, Gcal - 1324*103. 
  • Equivalent fuel specific rate for electric power supply, g e.f./kWh - 150.
  • Equivalent fuel specific rate for heat supply, kg e.f./Gcal - 170.

Brief Description of Main Solutions

The main equipment includes three SGT-800 gas turbine plants of Siemens company, three Е-70-4.5-440 waste steam recovery boilers of JSC ТКZ «Krasnyi Kotelshchik» (JSC «EМАlyans»), Russia. For the reason of highly hostile environment the equipment was installed in the Main Building. Provided for is the possibility of the GTU-TETs extension by one more similar power generation unit.

In the electric power output system provided for is the packaged GIS.

Astrakhan GTU-TETs operates in the heat consumption mode of Astrakhan Gas Processing Works, in parallel with the power system, to which the excessive electric power is output.