Rivne NPP. Power unit 4. Modernization of the automatic fire alarm system of reactor compartment, turbine hall, deaerator department, electrical devices rack, special building. Basic design

Разработка проектно-сметной документации для нового строительства и реконструкции действующих энергетических объектов и гражданского строительства

Rivne NPP. Power unit 4. Modernization of the automatic fire alarm system of reactor compartment, turbine hall, deaerator department, electrical devices rack, special building. Basic design

2021
1000 MW

Site location: Varash, Rivne region, Ukraine

Client: SE NNEGC Energoatom

Design stage: Basic design

 

The purpose of the project

Automatic fire alarm systems in non-systemic premises of reactor compartment, turbine hall, deaerator department, electrical devices rack, special building-2, ZRDES-44, ZRDEC-45, SDRPP-2, BNS-3, NSG-3, structures of section switches (BSV), buildings 4TR (BVRT-4TR), inputs of a backup transformer 5TRT (BVRT-5TR), RBC workshops (BMZ), ERP workshops (BM ERP), bitmos, sawmills are intended for timely detection of fire and elimination of its consequences.
The purpose of this technical re-equipment is to increase the reliability of automatic fire alarm systems and fire extinguishing (APS and APG) of non-systemic premises of reactor compartment, turbine hall, deaerator department, electrical devices rack, special building-2, ZRDEC-44, ZRDEC-45, ZDPP-2, BNS-3, NSG-3, NSG -3, BSV, BVRT-4TR, BVRT-5TR, BMZ, BM ERP, bitmos, sawmills by replacing the equipment that has produced its resource with a modern one.