Renewable energy

TEP-SOYUZ pays great attention to new technologies in the energy sector, in particular, the use of renewable sources for the production of electricity and heat.

According to our design, a 5 MW TPP was built in Pereyaslav, Kyiv region, operating on chips and woodworking waste. Feasibility studies for the construction of 9.6 MW biomass CHP plants in Kupyansk and Volchansk, Kharkiv region, has been developed.

We have developed basic and detailed design for solar farms: Novoperevolotskaya with a capacity of 15 MW in Orenburg region, Armavirskaya with a capacity of 29.4 (6x4.9) MW, Severskaya with a capacity of 44.1 MW and Mostovskaya with a capacity of 44.1 MW in Krasnodar Krai, RF.

Our company is also ready to develop design for wind power plants.