Location of the facility: Russian Federation, Kursk Region, Kurchativ, Industrial Zone, Branch of Rosenergoatom Concern OJSC, Kursk NPP.
Customer: KomplektEnergo LLC, End Customer: Rosenergoatom Concern OJSC.
Design stages:
- basic design
- detailed design
Technical and economic indicators of projects
Indicator | Units | Value, indicator |
Nominal heat output | MW (Gcal/year) | 170 |
Тhe temperature of the mains water at the inlet | °С | 70 (not less than 65) |
Тhe temperature of the mains water at the outlet | °С | 790 |
Range of regulation of heat output, in relation to the nominal | % | 30 to 100 |
Main and reserve fuel |
| fuel oil grade M-100 |
Estimated efficiency of the boiler when operating on fuel oil | % | not less than 90,16 |
Brief description of the main decisions
Purpose of the object
The main goal of the project is to replace three network hot water boilers of the PTVM-30M-4 type with three Eurotherm 35 (KV-GM-35-150N) hot water boilers, which will restore the design total power of the PPH to 170 Gcal/h, as well as ensure safe operation of power units of the Kursk NPP in accordance with the RD for the safe operation of NPPs.
The main task is to eliminate the risk of a shortage of thermal energy during the decommissioning of units of the Kursk NPP.
Basic equipment
Three water-heating boilers of the Eurotherm 35 type (KV-GM-35-150N), manufactured by Safonovo Hiting Solutions OJSC.
The project is under implementation.